Lorem ipsum Fusce iaculis lacus vitae nulla molestie scelerisque.
and get your introductory discount.
These penalties can range from 50,000 to 200,000 minimum wages, as stated in Article 165, Section I, Clause K, and Section II, Clause C, of the Electricity Industry Law (LIE).
We develop your work plan to comply with the Grid Code requirements set by the Energy Regulatory Commission.
We design a tailored solution to achieve compliance with the 10 parameters evaluated by the Grid Code. Learn more in the Grid Code section.
Contact us to schedule a personalized consultation.
Monday to Friday, from 9:00 a.m. to 5:00 p.m.
Monday to Friday, from 9:00 a.m. to 5:00 p.m.
We improve your power factor by offering the best technologies available on the market, tailored to your budget and protecting your finances.
Explore our electrical studies for safer and more efficient operations.
Explore MoreOptimize operations and reduce risks with tailored solutions.
Explore MoreMaximize your savings and reduce operational costs.
Explore MoreDuis aliquam mauris nec ipsum mollis, ac convallis ante consectetur. Nam aliquet ut justo ut semper. In molestie nibh ut iaculis tincidunt. Aenean eget metus arcu.
For more information, consult our technical resources and don't forget to contact us.
Non-compliance with the Grid Code can affect your industry’s operation in various ways, such as the imposition of economic penalties by the Energy Regulatory Commission (CRE), interruptions in the power supply, and damage to equipment due to power quality issues, such as voltage fluctuations or harmonics. Additionally, it can lead to increased operational costs due to energy inefficiency, harm the company's reputation with customers and authorities, and reduce the lifespan of equipment. Complying with the Grid Code ensures more efficient, stable, and penalty-free operations, promoting the continuity of industrial operations.
El incumplimiento del Código de Red puede tener graves consecuencias para la operación de tu industria, como sanciones económicas impuestas por la Comisión Reguladora de Energía (CRE), interrupciones en el suministro eléctrico, y daños a los equipos por variaciones de voltaje o distorsión armónica. Esto puede generar un aumento en los costos operativos debido a la ineficiencia energética, afectar la confiabilidad de los procesos industriales y reducir la vida útil de los equipos. Además, el incumplimiento puede dañar la reputación de la empresa, lo que afectaría su relación con clientes y autoridades regulatorias.
To prove that you comply with the Grid Code, you need to present evidence that your industry has implemented the appropriate measures to meet the established parameters, such as power factor, power quality, and harmonic compensation. This can include results from power quality studies, measurement reports, certifications of equipment and electrical systems, as well as a maintenance plan that ensures ongoing compliance. Additionally, you can conduct periodic audits and obtain a compliance report that is evaluated by the Energy Regulatory Commission (CRE) or an authorized body.
To prove that you comply with the Grid Code, you need to present evidence that your industry has implemented the appropriate measures to meet the established parameters, such as power factor, power quality, and harmonic compensation. This can include results from power quality studies, measurement reports, certifications of equipment and electrical systems, as well as a maintenance plan that ensures ongoing compliance. Additionally, you can conduct periodic audits and obtain a compliance report that is evaluated by the Energy Regulatory Commission (CRE) or an authorized body.
Having a low power factor in your industry’s operation can have several negative consequences, such as increased operational costs due to penalties imposed by the Federal Electricity Commission (CFE), which charges additional fees for inefficient energy use. It can also cause overloading of electrical equipment, such as transformers and generators, leading to greater wear and tear, premature failures, and higher maintenance costs. Additionally, a low power factor can reduce the energy efficiency of the installation, affecting productivity and the performance of industrial processes.
Conducting a short-circuit study, protection coordination, and arc flash study in your industry offers several key benefits, such as identifying and mitigating electrical risks, which improves personnel safety and protects equipment. These studies help ensure that protection systems, such as circuit breakers and fuses, operate efficiently and promptly in case of faults, preventing major damage and downtime. Additionally, they optimize energy distribution, reduce the risk of arc flash accidents, and improve operational reliability, resulting in greater efficiency and lower long-term maintenance costs.
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent quis ex in felis posuere auctor. Morbi erat nunc, dictum ut viverra sed, faucibus non massa. Sed sed diam arcu.
© 2024 Copixil. All rights reserved